STORAGE · GRID · DISPATCH

Move energy when the system needs it.

WasteGrid keeps storage, gas-generation availability, grid-node limits, dispatch intent and contractual performance in one operating record.

Battery storage and grid campus
OPERATING CONTEXT

Generation, storage and network constraints belong together.

The workspace places dispatchable gas generation, BESS and connection-point obligations in one governed storage-and-grid operating model.

01

Grid-node intelligence

Connection point, voltage, import/export limits, firm capacity and constraint state.

02

BESS dispatch

Charge/discharge windows, power targets, SoC boundaries, reserve requirements and approvals.

03

Plant availability

Natural-gas and circular-gas output can be considered alongside storage and grid obligations.

04

Performance obligations

Track measurable obligations against assets, sites, contracts and operating windows.

CONTROL BOUNDARY

Plan and govern without overstating authority.

WasteGrid records dispatch intent, operating constraints and contractual performance. It does not claim System Operator authority and does not issue physical plant commands unless a separately governed control integration is commissioned.

Grid-connected battery storage
PROJECT DELIVERY

Connect dispatchable generation, storage and grid obligations.

Keep gas-plant availability, BESS dispatch, network constraints and evidence in one operating thread.

SYSTEM INTEGRATION

Evidence-led monitoring for resilient energy systems.

Storage and grid projects need sound engineering, operational visibility and documented performance. The images below illustrate digital operations and site context, not installed WasteGrid BESS projects.

Illustrative digital operations dashboard on a laptop
Operations visibilityConceptual monitoring, not a live WasteGrid control interface.
Energy engineer with a tablet beside industrial processing equipment
Field engineeringSite assessment, integration and engineering oversight.

Visual concepts for illustration only. Images do not depict verified WasteGrid projects, personnel or operating assets.